Logitech G came to us in early 2023 with a fleet that was managed on paper and invisible in practice. A year later the whole fleet sat in one place in Warsaw. Two years in, the contract was renewed and expanded.

Fleet size25 m³
EU markets15
Working together since2023
Contract statusOngoing

Starting point · Q1 2023

The fleet grew every quarter. Nobody could say why.

Keyboards, mice, headsets, dongles and mousepads sat in local offices across 15 markets, none of them built as a warehouse. Returns from one show mixed with inbound for the next, and “what do we have, where, in what condition?” had no answer.

When planning events, managers couldn't audit stock, so they re-ordered. The existing fleet aged in a closet four offices away, unpaired and untracked.

What we did · 2023-2024

We took ownership. The fleet stopped leaking.

Warsaw hub · 2023 · fleet consolidated and audited
Warsaw hub · 2023 · fleet consolidated and audited
Warsaw hub · peripherals labeled and ready to ship
Warsaw hub · peripherals labeled and ready to ship
  1. 01Consolidation

    Every unit from 15 markets in one hub

    Every unit was audited on receiving: SKU, condition, firmware, pairing. About 14% of the fleet turned out to be unpaired, mice without dongles and dongles without mice. We re-paired what we could and retired the rest.

  2. 02Preparation

    Event-ready, not retail-ready

    Every variant (DE, US, UK, FR layout, switch type, color) is tagged in the Client Panel catalog. An AI agent builds the order from a prompt like “400 sets for Gamescom, DE layout, color-matched”. Hardware ships paired and on current firmware.

  3. 03Visibility

    A fleet you can see, you can plan

    The central team sees m³ utilization, 90-day forward bookings, per-asset condition and date conflicts. Local managers get a view scoped to their market. One platform with two interfaces and no data leakage.

Results · 2023-2026

The fleet stopped explaining itself and started working.

-67% Fewer re-orders YoY once the fleet became one auditable inventory.
4h → 35m On-site unpack per event. Pairing is done in Warsaw before dispatch.
<0.5% Annual loss from unpaired hardware. Previously an estimated 8-12%.
0 → 90 days Of forward booking visibility in Armory instead of quarterly guessing.
3 wk → 4h Quarterly fleet audit. Manual reconciliation of 15 markets replaced by one export.
+40% Contract scope growth after the first renewal.

On the table · 2025 proposals

What we've designed for them next.

None of these is in production yet. All are designed, costed and ready when the brand decides to scale.

Crates built around the peripheral mix

C01 · Transport

Crates built around the peripheral mix

Foam inserts matched to Logitech G's SKU mix instead of retail boxes. 12-18 SKUs per crate, 60+ events without foam compression, built-in GPS.

Simracing rigs in one case

C02 · Simracing

Simracing rigs in one case

Wheel, pedals, shifter and seat mounted, calibrated and shipped as one unit. On site you just switch it on.

A case for every peripheral

C03 · Protective cases

A case for every peripheral

Five sizes from a 10×17 cm mouse pouch to a 20×52 cm keyboard sleeve. Three-layer foam-knit, co-branded label and ID tag for tracking. Unlike retail boxes, they come back.

Case study 02 / 02

Confidential fleet: 40 m³ of PCs that arrived broken.

Read the case study

Let's talk about your fleet.

45 minutes, no deck, straight to operations. If we're not the right partner, we'll say so in one call.